Vesgantti Full Size Mattress,12 Inch Hybrid Innerspring Mattress in a Box with Memory Foam,Support & Pressure Relief,Medium Firm Feel for Aults(Full Size)

Vesgantti Full Size Mattress,12 Inch Hybrid Innerspring Mattress in a Box with Memory Foam,Support & Pressure Relief,Medium Firm Feel for Aults(Full Size)

$280.48
Skip to product information
Vesgantti Full Size Mattress,12 Inch Hybrid Innerspring Mattress in a Box with Memory Foam,Support & Pressure Relief,Medium Firm Feel for Aults(Full Size)

Vesgantti Full Size Mattress,12 Inch Hybrid Innerspring Mattress in a Box with Memory Foam,Support & Pressure Relief,Medium Firm Feel for Aults(Full Size)

$280.48
Shipping calculated at checkout.

About This

  • Support and Comfort: The full size mattress features individually wrapped pocket coils and pressure-relieving foam, which work together to provide targeted support, cradle your body shape and ease the aches and pains, so you awake feeling refreshed. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
  • Cooling and Breathable: The cooling gel particles and air-flow between coils make the foam ventilated, expel steamy sweat, maintain a comfortable sleep environment all night
  • Isolated Motion: The individually pocket spring allow it to absorb movement from your partner, you sleep deeply and soundly never be disturbed all night
  • Healthy and Skin-Friendly: Made of foam approved by CertiPUR-US, non fiberglass, non toxic, hypoallergenic, Vesgantti mattress is an affordable and optimal option for your family
  • Full Mattress in a Box: Vacuum Packed in a box, smaller size, easy to carry. We recommend allowing 72 hours for the mattress to be fully expanded. If you have any issues, please let us know without hesitation

Overview

  • Brand : Vesgantti
  • Size : Full
  • Product Dimensions : 75"L x 54"W x 12"Th
  • Top Style : Tight Top
  • Cover Material : Cotton Blend
  • Number of Layers : 3
  • Fill Material : Spring and Foam
  • Special Feature : Breathable, Hypoallergenic, Low Motion Transfer, Orthopedic, Pressure Relief
  • Color : Blue and White
  • Coil Type : Pocketed Coil
  • Item Weight 67 Pounds : Item Firmness Description Medium Firm
  • : Item Weight 67 Pounds
  • : Item Firmness Description Medium Firm

Goes well with...